Access Ramp - Preliminary Work
Preliminary work has been carried out on the access ramp as part of Phase 1 of the project.
The old path has been replaced with a new one, raised to the required gradient to align with the rest of the access ramp when it is completed in the early part of 2023.
This work was carried out for us by Phoenix Surfacing, Kettering.